Two storey £22.5m health centre opened in May 2020 during the height of the pandemic.
The healthcare centre is key to the transformation of primary and community health and wellbeing services across south Southwark. It is designed to integrate primary, community health and wellbeing services to meet the needs of a growing local population.
Download: Case study Tessa Jowell Health Centre May 2021 (PDF)
In the first year the centre was open, figures demonstrate the health centre is providing support to local residents and the NHS including:
- Over 50,000 COVID-19 vaccinations administered to local residents (as of May 2021)
- The Renal unit is now serving over 60 dialysis patients from the local area daily
- Blood tests for more than 40,000 patients at the centre, reducing waiting times for results
- 3,500 physiotherapy patients supported
- Hundreds of mothers and children supported through maternity and health visiting services
Tessa Jowell Health Centre videos
In May 2021, CHP, Fulcrum (LIFTco) and the local NHS teams commissioned videos to celebrate the first anniversary of the health centre opening.
Read more about Tessa Jowell Health Centre

Tessa Jowell Health Centre receives official opening
On Thursday 6th July the Tessa Jowell Health Centre in Dulwich, south London finally received the opening it deserves, with Dame Tessa’s daughter Jess Mills

Local primary school thank staff at the Tessa Jowell Health Centre
The Tessa Jowell Health Centre in East Dulwich recently received a special visit from pupils of nearby Goose Green Primary School. The Year 2 pupils

Health led artwork unveiled at the Tessa Jowell Health Centre
The first of a series of artwork pieces has been unveiled at the Tessa Jowell Health Centre in Dulwich. The project commissioned by NHS South

Tessa Jowell Health Centre celebrates 1st anniversary after year of providing vital support for the NHS and local residents
The Tessa Jowell Health Centre in Dulwich, London celebrates its first anniversary on 26 May, with new figures highlighting the important role the building is already playing to support local residents and the NHS at such a critical time. The health centre opened at the height of the first lockdown and has been vital to the local NHS response to COVID-19, treating patients closer to home so hospitals could focus on critical care.

Building a health centre for Dulwich and south Southwark – Topping out ceremony marks significant milestone
A traditional ‘topping out’ ceremony took place on Friday 12 April 2019 to celebrate the structural completion of the new health centre in Dulwich. The
Recent case studies

CHP Social Value Results: 2022-2023
At CHP we aim to put our buildings at the heart of the communities we serve and since the launch of our Buildings at the

Case study: Rossendale Primary Healthcare Centre CDC
Summary Rossendale Community Diagnostic Centre is a spoke building and is one of only four community diagnostic centre (CDC) hubs already up and running in